The construction of the hall for our company commenced following the completion of the foundation works. Our company played a key role throughout the entire structural construction process. During the project, the main steel structure erection, plinth construction, and professional waterproofing were completed, ensuring the building’s long-term reliability and resistance to weather conditions.
Following this phase, the hall received a modern fire-protective coating, after which the roof purlin system and roof cladding were installed. In the office section, a dry intermediate floor structure was constructed, while modern doors, windows, industrial gates, and natural daylight rooflights were also installed.
As the next major milestone of the project, once the building became fully watertight and draft-free, the installation of the heavy-duty industrial flooring began, ensuring the long-term operational reliability of the warehouse facility.